From January 1st, 2026, Law No. 77/2025/QH15 amending and supplementing several articles of the Law on Economical and Efficient Energy Use will officially come into effect. For many manufacturing businesses, the first reaction may be to review records, forms, and reporting responsibilities. This is necessary, but if the goal is merely "enough to comply," businesses may overlook a greater value: transforming energy data into a tool for reducing operating costs.
Effective energy management doesn't begin with buying more equipment or immediately installing solar power and storage systems. A logical starting point is to determine the scope of application, understand where the plant is consuming energy, identify areas of waste, and select solutions based on actual data.
What changes will the 2026 Energy Act bring to how businesses manage energy?
Law No. 77/2025/QH15 It was enacted by the National Assembly on June 18, 2025, and came into effect on January 1, 2026. Subsequently, Decree No. 30/2026/ND-CP Detailed regulations and guidelines for implementation.
The new legal framework addresses energy management and monitoring, key energy-consuming facilities, energy auditing, energy labeling, high-efficiency equipment, energy service organizations, support mechanisms, and inspection work. This indicates that energy efficiency is being approached as a systematic governance activity, rather than just a campaign to save electricity.
However, not all businesses have the same obligations. Specific responsibilities depend on the type of facility, consumption levels, whether it is on the list of key energy-consuming facilities, and relevant industry regulations. Businesses need to assess their own specific situation rather than applying a single checklist to all factories.
If businesses only view this as a compliance issue, what might they be missing out on?
According to information released by the Ministry of Industry and Trade, the industrial sector accounts for over 501 TP3T of total national energy consumption and has the potential to save approximately 20–301 TP3T. This is an estimate at the industry level, not a default saving figure for each factory. Nevertheless, the figures show that energy costs still have significant room for improvement for manufacturing operations.
If compliance is left to just one department to finalize reports at the end of the period, a business may encounter three problems:
- The data was compiled but did not help identify the area or device experiencing unusual consumption.
- Energy audits become independent reports, not project portfolios with assigned responsibilities and deadlines.
- Equipment purchase decisions are still based primarily on the initial investment cost, without accounting for electricity costs, maintenance, and the operational lifecycle.
In that case, the business may have fulfilled part of its administrative obligations but has not yet reduced the cost per unit of product.
Compliance and cost saving are not two opposing choices.
The same activity can either simply generate records or become a management tool, depending on how the business organizes it.
| Work | If it's just for compliance | If the goal is to create value |
|---|---|---|
| Data collection | Summary of end-of-period data | Monitor trends, consumption rates, and anomalies. |
| Energy audit | Complete a report | Develop a list of solutions based on investment level and impact. |
| Energy Manager | The job title is listed on the record. | There are responsibilities, targets, and coordination authority between departments. |
| Device selection | Meets minimum requirements | Evaluate lifecycle performance and costs. |
| Solar, BESS, or EMS | Trend investing | Calculations are based on load, operating objectives, and technical conditions. |
The second approach does not negate the legal requirement. On the contrary, standardized data for compliance can become the foundation for businesses to make better investment decisions.

Where should a business begin?
1. Accurately define the scope of application.
Businesses need to determine whether their facilities fall into the category of major energy users or generate specific obligations regarding energy planning, reporting, management, and auditing. This should be based on converted consumption data and applicable regulations, not solely on site size or design capacity.
2. Establishing an energy baseline
Electricity bills show total costs but don't explain why costs increase or decrease. Businesses should combine energy data with production, operating hours, weather, shifts, and line changes. A baseline helps differentiate increases due to increased production from increases due to decreased efficiency.
3. Separate the main load groups.
A single main meter is often insufficient to identify loss points. Depending on the type of production, businesses may need to monitor individual lines, HVAC, compressed air, refrigeration systems, pumps, fans, lighting, boilers, or auxiliary areas. The level of measurement should match the decision-making value the data provides; sensors should not be installed on every device unless there is a clear usage objective.
4. Prioritize solutions that require little or no capital first.
Many opportunities arise from operating schedules, temperature settings, compressed air leaks, heat exchanger cleaning, motor maintenance, load control, and shutdown procedures. These solutions are often easy to test, easy to measure results, and help businesses build confidence before approving large projects.
5. Only invest when you have data and goals.
High-efficiency motors, inverters, control systems, HVAC upgrades, rooftop solar power, BESS, or EMS can all deliver value under the right conditions. However, efficiency depends on the load, operating time, pricing, equipment condition, maintenance plan, and integration with existing systems.
Specifically, the Energy Act 2026 should not be interpreted as requiring all factories to install solar power or BESS. Businesses can refer to the analysis for further details. When is BESS-integrated solar power a worthwhile investment? and notes on solar power design for factory rooftops.
Three tiers of solutions to reduce energy costs.
Level 1: Operation and Maintenance
Adjusting the operating schedule, eliminating unnecessary downtime, addressing leaks, maintaining equipment, and training operators are the first solutions to consider, as they help produce initial results without making major system changes.
Floor 2: Targeted renovation
Replacing inefficient equipment, adding variable frequency drives, optimizing refrigeration and compressed air systems, renovating the building envelope, or automating control systems—each item requires a baseline, measurement methods, and a construction plan to minimize production disruptions.
Level 3: Strategic Investments
Solar, BESS, EMS, or a complete overhaul may be considered once the business has a clear understanding of its load and long-term goals regarding cost, capacity, emissions, or redundancy. A single payback period should not be used for all plants.
New plants and existing plants require different approaches.
For new plants, energy management should be incorporated into the design brief. Considerations include metering schemes, data connectivity, equipment efficiency, technical space, maintenance requirements, commissioning criteria, and handover documentation. Preparation from the outset is generally more flexible than adding elements after the plant is operational.
For existing plants, the first priority is surveying and measurement. The renovation plan should be phased according to downtime, construction area, safety requirements, and system restoration capabilities. Renovate an existing factory without disrupting production. Provide additional relevant construction organization principles.
90-Day Roadmap: From Compliance to Cost-Saving Plan

First 30 days: Assess the current situation.
- Compare the scope and obligations that apply.
- Collect invoices, production data, operating hours, and system diagrams.
- Identify the responsible personnel and coordination mechanisms between engineering, production, finance, and purchasing.
Days 31–60: Measurement and Analysis
- Identify the major load groups.
- Check for discrepancies between energy consumption and output.
- Assess the condition of the equipment and its operating conditions.
- Create a list of solutions that require no capital, little capital, and significant investment.
Days 61–90: Transition to implementation program
- Select the priority solutions and the person responsible.
- Determine the metrics before and after implementation.
- Assess the impact on production, safety, and maintenance.
- Plan the capital investment and determine an appropriate implementation timeline.
Five mistakes businesses should avoid.
- Assuming all factories have the same legal obligations.
- Purchase technology before having load data and operational targets.
- They only track the total invoice amount without relating it to production volume.
- Assigning responsibility for energy conservation but not granting authority for coordination or setting targets.
- Separate energy management from plant design, maintenance, procurement, and expansion planning.
At what stage can DATA Cons provide support?
In new construction or factory renovation projects, DATA Cons can coordinate site surveys and technical system assessments; review design requirements; develop renovation plans; design, construct, and integrate appropriate technical solutions. For solar and BESS projects, the plan needs to be evaluated based on the structure, electrical system, load, operational objectives, and safety requirements of each project.
When a business is required to undergo an energy audit, the audit must be conducted by an organization that meets the legal requirements. DATA Cons does not replace the legal function of an auditing firm unless it has a corresponding and verified qualification profile.
Conclude
The 2026 Energy Act imposes stricter regulations, but compliance doesn't necessarily just increase paperwork. If businesses establish a baseline, appropriate metering system, and prioritized portfolio of solutions, the same data source can simultaneously serve reporting, cost control, investment planning, and emissions reduction targets.
The important thing is not which technology to invest in first, but to identify the right problem to solve. Businesses can Discuss with DATA Cons about the current state of the plant and the need for design or renovation of the technical systems. before developing a detailed plan.